LOS ANGELES--(BUSINESS WIRE)--Tutor Perini Corporation (the “Company”) (NYSE: TPC), a leading civil, building and specialty construction company, reported results today for the first quarter of 2021. Revenue was $1.21 billion compared to $1.25 billion for the first quarter of last year, as reduced activities on Building segment projects were mostly offset by increased volume on Specialty Contractors segment projects. Despite the slightly lower revenue, income from construction operations for the first quarter of 2021 was $49.7 million, up 5% compared to $47.2 million for the first quarter of last year. The increase was primarily driven by a shift toward higher-margin projects within the Civil segment, including favorable contributions from projects in California and Guam. Net income attributable to the Company for the first quarter of 2021 was $16.0 million, or $0.31 per diluted share, compared to $17.4 million, or $0.34 per diluted share, for the first quarter of 2020. The decrease in net income attributable to the Company, and correspondingly EPS, was principally driven by a higher effective tax rate in the current period compared to the same quarter last year.
First quarter 2021 backlog remained solid at $8.1 billion compared to $8.3 billion at the end of 2020. As anticipated, backlog declined as a result of revenue that modestly outpaced new awards in the quarter. New awards totaled $1.0 billion and included a $269 million government building facility in California, more than $220 million for various civil projects in the Midwest and $120 million of additional funding for a mass-transit project in California. The Company now anticipates booking the previously announced $478 million LAX Airport Metro Connector project into backlog in the second quarter of 2021. The Company also anticipates bidding on several large projects this year and during the first half of 2022, and expects backlog growth to resume in the second half of 2021 to levels that will continue to support future revenue growth.
Outlook and Guidance
“Overall, we delivered solid first-quarter results that were modestly ahead of expectations,” commented Ronald Tutor, Chairman and Chief Executive Officer. Tutor continued, “We are currently bidding several large projects, with a large stream of other significant bids expected to occur later this year and continuing well into next year. We look forward to winning our share of these opportunities and resuming strong backlog growth in the second half of this year. We are also encouraged by the Biden Administration's strong focus on infrastructure investments and the potential for substantial federal infrastructure spending on the horizon, which would further bolster our already positive long-term business outlook.”
Based on the Company’s year-to-date results in 2021 and the current outlook for the remainder of the year, the Company is affirming its EPS guidance and still expects EPS to be in the range of $1.80 to $2.20.
First Quarter 2021 Conference Call
The Company will host a conference call at 2:00 PM Pacific Time on Wednesday, May 5, 2021, to discuss the first quarter 2021 results. To participate in the conference call, please dial 877-407-8293 five to ten minutes prior to the scheduled time. International callers should dial +1-201-689-8349.
The conference call will be webcast live over the Internet and can be accessed by all interested parties on Tutor Perini's website at www.tutorperini.com. For those unable to participate during the live call, the webcast will be available for replay shortly after the call on the website.
About Tutor Perini Corporation
Tutor Perini Corporation is a leading civil, building and specialty construction company offering diversified general contracting and design-build services to private customers and public agencies throughout the world. We have provided construction services since 1894 and have established a strong reputation within our markets by executing large, complex projects on time and within budget, while adhering to strict quality control measures. We offer general contracting, pre-construction planning and comprehensive project management services, including planning and scheduling of manpower, equipment, materials and subcontractors required for a project. We also offer self-performed construction services including site work, concrete forming and placement, steel erection, electrical, mechanical, plumbing and heating, ventilation and air conditioning (HVAC). We are known for our major complex building project commitments, as well as our capacity to perform large and complex transportation and heavy civil construction for government agencies and private customers throughout the world.
Forward-Looking Statements
The statements contained in this release, including those set forth in the section “Outlook and Guidance,” that are not purely historical are forward-looking statements within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended, including without limitation, statements regarding the Company’s expectations, hopes, beliefs, intentions or strategies regarding the future and statements regarding future guidance or estimates and non-historical performance. These forward-looking statements are based on the Company’s current expectations and beliefs concerning future developments and their potential effects on the Company. While the Company’s expectations, beliefs and projections are expressed in good faith and the Company believes there is a reasonable basis for them, there can be no assurance that future developments affecting the Company will be those that we have anticipated. These forward-looking statements involve a number of risks, uncertainties (some of which are beyond the control of the Company) or other assumptions that may cause actual results or performance to be materially different from those expressed or implied by such forward-looking statements. These risks and uncertainties include, but are not limited to: the COVID-19 pandemic, which has adversely impacted, and could continue to adversely impact, our business, financial condition and results of operations; revisions of estimates of contract risks, revenue or costs, the timing of new awards or the pace of project execution, which may result in losses or lower than anticipated profit; unfavorable outcomes of existing or future litigation or dispute resolution proceedings against customers (project owners, developers, general contractors, etc.), subcontractors or suppliers, as well as failure to promptly recover significant working capital invested in projects subject to such matters; the requirement to perform extra, or change order, work resulting in disputes or claims and adversely affecting our working capital, profits and cash flows; a significant slowdown or decline in economic conditions; risks and other uncertainties associated with assumptions and estimates used to prepare financial statements; inability to retain key members of our management, to hire and retain personnel required to complete projects or implement succession plans for key officers; increased competition and failure to secure new contracts; decreases in the level of government spending for infrastructure and other public projects; failure to meet contractual schedule requirements, which could result in higher costs and reduced profits or, in some cases, exposure to financial liability for liquidated damages and/or damages to customers; client cancellations of, or reductions in scope under, contracts reported in our backlog; possible systems and information technology interruptions, including due to cyberattack, systems failures or other similar events; failure of our joint venture partners to perform their venture obligations, which could impose additional financial and performance obligations on us, resulting in reduced profits or losses and/or reputational harm; economic, political, regulatory and other risks, including civil unrest, security issues, labor conditions, corruption and other unforeseeable events in countries where we do business, resulting in unanticipated losses; the impact of inclement weather conditions on projects; risks related to government contracts and related procurement regulations; violations of the U.S. Foreign Corrupt Practices Act and similar worldwide anti-bribery laws, which could result in unanticipated losses; adverse health events, such as an epidemic or a pandemic; failure to meet our obligations under our debt agreements; downgrades in our credit ratings; impairment of our goodwill or other indefinite-lived intangible assets; uncertainty from the expected discontinuance of the London Interbank Offered Rate and transition to any other interest rate benchmark; and other risks and uncertainties discussed under the heading “Risk Factors” in our Annual Report on Form 10-K for the year ended December 31, 2020 filed on February 24, 2021 and in other reports that we file with the Securities and Exchange Commission from time to time. The Company undertakes no obligation to publicly update or revise any forward-looking statements, whether as a result of new information, future events or otherwise, except as may be required under applicable securities laws.
Tutor Perini Corporation |
||||||||
Condensed Consolidated Statements of Income |
||||||||
Unaudited |
||||||||
|
|
|
|
|
||||
|
|
Three Months Ended
|
||||||
(in thousands, except per common share amounts) |
|
2021 |
|
2020 |
||||
REVENUE |
|
$ |
1,207,595 |
|
|
$ |
1,250,729 |
|
COST OF OPERATIONS |
|
(1,097,140 |
) |
|
(1,139,649 |
) |
||
GROSS PROFIT |
|
110,455 |
|
|
111,080 |
|
||
General and administrative expenses |
|
(60,751 |
) |
|
(63,853 |
) |
||
INCOME FROM CONSTRUCTION OPERATIONS |
|
49,704 |
|
|
47,227 |
|
||
Other income, net |
|
175 |
|
|
481 |
|
||
Interest expense |
|
(17,810 |
) |
|
(16,436 |
) |
||
INCOME BEFORE INCOME TAXES |
|
32,069 |
|
|
31,272 |
|
||
Income tax expense |
|
(6,964 |
) |
|
(5,134 |
) |
||
NET INCOME |
|
25,105 |
|
|
26,138 |
|
||
LESS: NET INCOME ATTRIBUTABLE TO NONCONTROLLING INTERESTS |
|
9,071 |
|
|
8,767 |
|
||
NET INCOME ATTRIBUTABLE TO TUTOR PERINI CORPORATION |
|
$ |
16,034 |
|
|
$ |
17,371 |
|
BASIC EARNINGS PER COMMON SHARE |
|
$ |
0.31 |
|
|
$ |
0.35 |
|
DILUTED EARNINGS PER COMMON SHARE |
|
$ |
0.31 |
|
|
$ |
0.34 |
|
WEIGHTED-AVERAGE COMMON SHARES OUTSTANDING: |
|
|
|
|
||||
BASIC |
|
50,913 |
|
|
50,338 |
|
||
DILUTED |
|
51,348 |
|
|
50,836 |
|
Tutor Perini Corporation |
||||||||||||||||||||||||
Segment Information |
||||||||||||||||||||||||
Unaudited |
||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
||||||||||||||||
|
Reportable Segments |
|
|
|
|
|||||||||||||||||||
(in thousands) |
Civil |
Building |
Specialty
|
Total |
|
Corporate |
|
Consolidated
|
||||||||||||||||
Three Months Ended March 31, 2021 |
|
|
|
|
|
|
|
|
||||||||||||||||
Total revenue |
$ |
583,144 |
|
$ |
457,170 |
|
$ |
324,948 |
|
$ |
1,365,262 |
|
|
$ |
— |
|
|
$ |
1,365,262 |
|
||||
Elimination of intersegment revenue |
(107,569 |
) |
(49,937 |
) |
(161 |
) |
(157,667 |
) |
|
— |
|
|
(157,667 |
) |
||||||||||
Revenue from external customers |
$ |
475,575 |
|
$ |
407,233 |
|
$ |
324,787 |
|
$ |
1,207,595 |
|
|
$ |
— |
|
|
$ |
1,207,595 |
|
||||
Income (loss) from construction operations |
$ |
50,105 |
|
$ |
11,216 |
|
$ |
1,324 |
|
$ |
62,645 |
|
|
$ |
(12,941 |
) |
(a) |
$ |
49,704 |
|
||||
Capital expenditures |
$ |
9,564 |
|
$ |
73 |
|
$ |
145 |
|
$ |
9,782 |
|
|
$ |
53 |
|
|
$ |
9,835 |
|
||||
Depreciation and amortization(b) |
$ |
22,713 |
|
$ |
432 |
|
$ |
959 |
|
$ |
24,104 |
|
|
$ |
2,770 |
|
|
$ |
26,874 |
|
||||
|
|
|
|
|
|
|
|
|
||||||||||||||||
Three Months Ended March 31, 2020 |
|
|
|
|
|
|
|
|
||||||||||||||||
Total revenue |
$ |
580,087 |
|
$ |
505,082 |
|
$ |
282,452 |
|
$ |
1,367,621 |
|
|
$ |
— |
|
|
$ |
1,367,621 |
|
||||
Elimination of intersegment revenue |
(93,458 |
) |
(23,318 |
) |
(116 |
) |
(116,892 |
) |
|
— |
|
|
(116,892 |
) |
||||||||||
Revenue from external customers |
$ |
486,629 |
|
$ |
481,764 |
|
$ |
282,336 |
|
$ |
1,250,729 |
|
|
$ |
— |
|
|
$ |
1,250,729 |
|
||||
Income (loss) from construction operations |
$ |
46,121 |
|
$ |
3,516 |
|
$ |
8,279 |
|
$ |
57,916 |
|
|
$ |
(10,689 |
) |
(a) |
$ |
47,227 |
|
||||
Capital expenditures |
$ |
11,192 |
|
$ |
12 |
|
$ |
473 |
|
$ |
11,677 |
|
|
$ |
16 |
|
|
$ |
11,693 |
|
||||
Depreciation and amortization(b) |
$ |
18,616 |
|
$ |
427 |
|
$ |
993 |
|
$ |
20,036 |
|
|
$ |
2,775 |
|
|
$ |
22,811 |
|
||||
(a) |
Consists primarily of corporate general and administrative expenses. |
|
(b) |
Depreciation and amortization is included in income (loss) from construction operations. |
Tutor Perini Corporation |
||||||||
Condensed Consolidated Balance Sheets |
||||||||
Unaudited |
||||||||
(in thousands, except share and per share amounts) |
|
As of March 31,
|
|
As of December 31,
|
||||
|
|
|
|
|
||||
ASSETS |
||||||||
CURRENT ASSETS: |
|
|
|
|
||||
Cash and cash equivalents ($91,768 and $105,735 related to variable interest entities (“VIEs”)) |
|
$ |
318,720 |
|
|
$ |
374,289 |
|
Restricted cash |
|
82,086 |
|
|
77,563 |
|
||
Restricted investments |
|
74,062 |
|
|
78,912 |
|
||
Accounts receivable ($78,924 and $86,012 related to VIEs) |
|
1,368,892 |
|
|
1,415,063 |
|
||
Retainage receivable ($129,050 and $122,335 related to VIEs) |
|
661,382 |
|
|
648,441 |
|
||
Costs and estimated earnings in excess of billings ($55,315 and $39,846 related to VIEs) |
|
1,255,992 |
|
|
1,236,734 |
|
||
Other current assets ($49,182 and $51,746 related to VIEs) |
|
236,943 |
|
|
249,455 |
|
||
Total current assets |
|
3,998,077 |
|
|
4,080,457 |
|
||
PROPERTY AND EQUIPMENT ("P&E"), net of accumulated depreciation of $452,904 and $434,294 (net P&E of $8,526 and $12,840 related to VIEs) |
|
478,338 |
|
|
489,217 |
|
||
GOODWILL |
|
205,143 |
|
|
205,143 |
|
||
INTANGIBLE ASSETS, NET |
|
116,472 |
|
|
123,115 |
|
||
OTHER ASSETS |
|
147,977 |
|
|
147,685 |
|
||
TOTAL ASSETS |
|
$ |
4,946,007 |
|
|
$ |
5,045,617 |
|
|
|
|
|
|
||||
LIABILITIES AND EQUITY |
||||||||
CURRENT LIABILITIES: |
|
|
|
|
||||
Current maturities of long-term debt, net of unamortized discount and debt issuance costs totaling $941 and $2,040 |
|
$ |
101,020 |
|
|
$ |
100,188 |
|
Accounts payable ($81,694 and $116,461 related to VIEs) |
|
716,326 |
|
|
794,611 |
|
||
Retainage payable ($28,027 and $26,439 related to VIEs) |
|
318,692 |
|
|
315,135 |
|
||
Billings in excess of costs and estimated earnings ($332,704 and $362,427 related to VIEs) |
|
818,757 |
|
|
839,222 |
|
||
Accrued expenses and other current liabilities ($6,838 and $9,595 related to VIEs) |
|
176,264 |
|
|
215,207 |
|
||
Total current liabilities |
|
2,131,059 |
|
|
2,264,363 |
|
||
LONG-TERM DEBT, less current maturities, net of unamortized discount and debt issuance costs totaling $19,478 and $20,209 |
|
924,651 |
|
|
925,277 |
|
||
DEFERRED INCOME TAXES |
|
82,950 |
|
|
82,966 |
|
||
OTHER LONG-TERM LIABILITIES |
|
235,266 |
|
|
230,066 |
|
||
TOTAL LIABILITIES |
|
3,373,926 |
|
|
3,502,672 |
|
||
COMMITMENTS AND CONTINGENCIES |
|
|
|
|
||||
EQUITY |
|
|
|
|
||||
Stockholders' equity: |
|
|
|
|
||||
Preferred stock - authorized 1,000,000 shares ($1 par value), none issued |
|
— |
|
|
— |
|
||
Common stock - authorized 112,500,000 shares ($1 par value), issued and outstanding 50,937,607 and 50,827,205 shares |
|
50,938 |
|
|
50,827 |
|
||
Additional paid-in capital |
|
1,127,624 |
|
|
1,127,385 |
|
||
Retained earnings |
|
438,419 |
|
|
422,385 |
|
||
Accumulated other comprehensive loss |
|
(47,356 |
) |
|
(46,741 |
) |
||
Total stockholders' equity |
|
1,569,625 |
|
|
1,553,856 |
|
||
Noncontrolling interests |
|
2,456 |
|
|
(10,911 |
) |
||
TOTAL EQUITY |
|
1,572,081 |
|
|
1,542,945 |
|
||
TOTAL LIABILITIES AND EQUITY |
|
$ |
4,946,007 |
|
|
$ |
5,045,617 |
|
Tutor Perini Corporation |
||||||||
Condensed Consolidated Statements of Cash Flows |
||||||||
Unaudited |
||||||||
|
Three Months Ended March 31, |
|||||||
(in thousands) |
2021 |
|
2020 |
|||||
Cash Flows from Operating Activities: |
|
|
|
|||||
Net income |
$ |
25,105 |
|
|
$ |
26,138 |
|
|
Adjustments to reconcile net income to net cash used in operating activities: |
|
|
|
|||||
Depreciation |
20,231 |
|
|
16,999 |
|
|||
Amortization of intangible assets |
6,643 |
|
|
5,812 |
|
|||
Share-based compensation expense |
2,448 |
|
|
4,244 |
|
|||
Change in debt discounts and deferred debt issuance costs |
2,017 |
|
|
3,486 |
|
|||
Deferred income taxes |
95 |
|
|
2,474 |
|
|||
(Gain) loss on sale of property and equipment |
20 |
|
|
(461 |
) |
|||
Changes in other components of working capital |
(108,385 |
) |
|
(90,884 |
) |
|||
Other long-term liabilities |
5,027 |
|
|
1,061 |
|
|||
Other, net |
95 |
|
|
(2,876 |
) |
|||
NET CASH USED IN OPERATING ACTIVITIES |
(46,704 |
) |
|
(34,007 |
) |
|||
|
|
|
|
|||||
Cash Flows from Investing Activities: |
|
|
|
|||||
Acquisition of property and equipment |
(9,835 |
) |
|
(11,693 |
) |
|||
Proceeds from sale of property and equipment |
457 |
|
|
583 |
|
|||
Investments in securities |
(2,910 |
) |
|
(9,696 |
) |
|||
Proceeds from maturities and sales of investments in securities |
6,870 |
|
|
6,211 |
|
|||
NET CASH USED IN INVESTING ACTIVITIES |
(5,418 |
) |
|
(14,595 |
) |
|||
|
|
|
|
|||||
Cash Flows from Financing Activities: |
|
|
|
|||||
Proceeds from debt |
74,251 |
|
|
348,688 |
|
|||
Repayment of debt |
(75,939 |
) |
|
(283,915 |
) |
|||
Cash payments related to share-based compensation |
(1,236 |
) |
|
(694 |
) |
|||
Distributions paid to noncontrolling interests |
— |
|
|
(13,500 |
) |
|||
Contributions from noncontrolling interests |
4,000 |
|
|
— |
|
|||
NET CASH PROVIDED BY FINANCING ACTIVITIES |
1,076 |
|
|
50,579 |
|
|||
|
|
|
|
|||||
Net increase (decrease) in cash, cash equivalents and restricted cash |
(51,046 |
) |
|
1,977 |
|
|||
Cash, cash equivalents and restricted cash at beginning of period |
451,852 |
|
|
202,101 |
|
|||
Cash, cash equivalents and restricted cash at end of period |
$ |
400,806 |
|
|
$ |
204,078 |
|
Tutor Perini Corporation |
||||||||||||||||
Backlog Information |
||||||||||||||||
Unaudited |
||||||||||||||||
|
|
|
|
|
|
|
|
|
||||||||
(in millions) |
|
Backlog at
|
|
New Awards in the
|
|
Revenue in the
|
|
Backlog at
|
||||||||
Civil |
|
$ |
4,783.6 |
|
|
$ |
457.0 |
|
|
$ |
(475.6 |
) |
|
$ |
4,765.0 |
|
Building |
|
1,702.3 |
|
|
344.2 |
|
|
(407.2 |
) |
|
1,639.3 |
|
||||
Specialty Contractors |
|
1,859.8 |
|
|
157.5 |
|
|
(324.8 |
) |
|
1,692.5 |
|
||||
Total |
|
$ |
8,345.7 |
|
|
$ |
958.7 |
|
|
$ |
(1,207.6 |
) |
|
$ |
8,096.8 |
|
(a) |
New awards consist of the original contract price of projects added to our backlog plus or minus subsequent changes to the estimated total contract price of existing contracts. |