Samson Oil & Gas Operational Advisory

DENVER & PERTH, Australia--()--Samson Oil & Gas Limited (ASX: SSN; NYSE MKT: SSN):

NORTH STOCKYARD PROJECT, WILLIAMS COUNTY, NORTH DAKOTA

The infill development plan for North Stockyard is to drill 8 middle Bakken wells and 8 Three Forks wells. For ease of reference, the current status of each well is set out below with separate tables for each drill pad:

                       
TOFTE 1 PAD    

Lateral

length

    Objective     Status    

IP rate

BOPD

   

Avg. Rate

BOPD#

   

Cum to

Date BO

Billabong 2-13-14HBK     6,147 ft.     Bakken    

Recovery of

drill pipe

planned for

June 2014

    NA     NA     NA
Sail and Anchor 4-13-14HBK     6,375 ft.     Bakken     Flowing     1,323     326     37,615
Blackdog 3-13-14     8,383 ft.     Bakken     Flowing     1,995     854     54,895
 
                       
TOFTE 2 PAD    

Lateral

length

    Objective     Status    

IP rate

BOPD

   

Avg. Rate

BOPD#

   

Cum to

Date BO

Tooheys 4-15-14HBK     6,740 ft.     Bakken     Pumping     1,078     294     45,843
Coopers 2-15-14HBK     6,360 ft.     Bakken    

Pump install

May 28th

    556     NA     31,279
Little Creature 3-15-14H     7,578 ft.     Bakken     Pumping     501     427     49,491
 
                       

MATILDA BAY

PAD

   

Lateral

length

    Objective     Status    

IP rate

BOPD

   

Avg. Rate

BOPD#

   

Cum to

Date BO

Matilda Bay 2-15-H     4,215 ft.     Bakken    

Frack

completed

    NA     NA     NA
Matilda Bay 1-15-H     4,215 ft.     Bakken    

Frack

suspended

    NA     NA     NA
 

#The Avg. Daily rate is an average of the last week’s production or the average after the well was put back into production.

                       

TF NORTH

PAD

   

Lateral

length

    Objective     Status    

IP rate

BOPD

   

Avg. Rate

BOPD#

   

Cum to

Date BO

Bootleg 4-14-15TFH     7,211 ft.    

Three

Forks

   

Drilling in

progress

    NA     NA     NA
Bootleg 5-14-15TFH     7,495 ft.    

Three

Forks

   

Drilling in

progress

    NA     NA     NA
Ironbank 4-14-13TFH     7,466 ft.    

Three

Forks

   

APD

approved

    NA     NA     NA
Ironbank 5-14-13TFH     7,495 ft.    

Three

Forks

   

APD

approved

    NA     NA     NA
 
                       

TF SOUTH

PAD

   

Lateral

length

    Objective     Status    

IP rate

BOPD

   

Avg. Rate

BOPD#

   

Cum to

Date BO

Bootleg 6-14-15TFH     6,867 ft.    

Three

Forks

   

APD

approved

    NA     NA     NA
Bootleg 7-14-15TFH     6,973 ft.    

Three

Forks

   

APD

approved

    NA     NA     NA
Ironbank 6-14-13TFH     7,434 ft.    

Three

Forks

   

APD in

prep

    NA     NA     NA
Ironbank 7-14-13TFH     7,458 ft.    

Three

Forks

   

APD in

prep

    NA     NA     NA
 

TOTAL COMPANY PRODUCTION

Samson net production for 2014 is as follows:

               
      JAN 2014     FEB 2014     MARCH 2014     APRIL 2014
OIL, BO     5,767     12,180     11,154     15,775
GAS, MCF     16,323     17,016     13,067     11,345
BOE     8,487     15,016     13,332     17,666
BOEPD     273     536     430     589
 

BO: Barrels of oil
BOE: Barrels of oil equivalent (gas converted at its heating value)
BOPD: Barrels of oil per day
MCF: Thousand cubic feet
BOEPD: Barrels of oil equivalent per day
NA: Not available
APD: Application for Permit to Drill
IP Rate: Gross first 24 hour oil rate
Current rate BOPD: Barrels of Oil per Day
Cum to Date: Cumulative gross BO

COMMENTARY

The Coopers well is scheduled for a rod pump installation on Wednesday, May 28th.

The Bootleg 4-14-15TFH well was drilled to the production casing landing point of 11,563 feet measured depth, where 7 inch casing was run and cemented. The lateral is currently drilling ahead in the Three Forks at 15,746 feet measured depth.

As advised previously, the Bootleg 5-14-15TFH well has been drilled to a measured depth of 11,675 feet, and 7 inch casing has been landed and set in the Three Forks.

Hydraulic fracture stimulation operations have been completed on Matilda Bay 2-15H with 3.5 million pounds of proppant placed. Operations on Matilda Bay 1-15H were suspended after fracking Zone 6 (Of 24 zones) due to a pressure loss that needs to be investigated further. Flow back operations are expected to commence later this week on Matilda Bay 2-15H.

Samson’s working interest and its net revenue interest for the North Stockyard Project is set out in the following table:

                   
Well           Working interest           Net revenue Interest
Billabong 2-13-14HBK           50.052000%           38.289780%
Sail and Anchor 4-13-14HBK           25.028509%           19.146809%
Blackdog 3-13-14H           24.863526%           19.020597%
Tooheys 4-15-14HBK           28.232033%           21.597505%
Coopers 2-15-14HBK           28.232033%           21.597505%
Little Creature 3-15-14H           27.759719%           21.236185%
Matilda Bay 2-15-H           32.972255%           25.223775%
Matilda Bay 1-15-H           32.972255%           25.223775%
Bootleg 4-14-15TFH           28.386344%           21.715553%
Bootleg 5-14-15TFH           28.386344%           21.715553%
Ironbank 4-14-13TFH           26.746521%           20.461089%
Ironbank 7-14-13TFH           26.746521%           20.461089%
Bootleg 6-14-15TFH*           28.386344%           21.715553%
Bootleg 7-14-15TFH*           28.386344%           21.715553%
Ironbank 6-14-13TFH*           26.746521%           20.461089%
Ironbank 7-14-13TFH*           26.746521%           20.461089%
 

* Wells have yet to be elected by Samson and therefore are subject to change.

BLUFF #1-11 WELL, HAWK SPRINGS PROJECT, GOSHEN COUNTY, WYOMING

The Trinidad Drilling Rig #47 has commenced its rig move and is expected to be rigged up on Friday, May 30th. Drilling operations will commence shortly thereafter from the surface casing shoe that was previously set and cemented at 1,037 feet. A 7 inch intermediate casing string is expected to be set at around 7,000 feet prior to entering the primary target.

The Bluff Prospect is an important test of the Permian and Pennsylvanian age sections of the Hawk Springs Project. The prospect is defined by a 3-D seismic grid survey which has demonstrated that it can detect the existence of porous sandstones within this prospective geologic section. The Bluff prospect is a four-way dip closed anticlinal structure. Success at Bluff will provide encouragement to test as many as 18 additional prospects that share similar seismic characteristics with Bluff.

Samson’s Ordinary Shares are traded on the Australian Securities Exchange under the symbol "SSN". Samson's American Depository Shares (ADSs) are traded on the New York Stock Exchange MKT under the symbol "SSN". Each ADS represents 20 fully paid Ordinary Shares of Samson. Samson has a total of 2,837 million ordinary shares issued and outstanding (including 230 million options exercisable at AUD 3.8 cents), which would be the equivalent of 141.85 million ADSs. Accordingly, based on the NYSE MKT closing price of US$0.36 per ADS on May 27th, 2014, the Company has a current market capitalization of approximately US$53.62 million (the options have been valued at an exchange rate of 0.9363). Correspondingly, based on the ASX closing price of A$0.019 for ordinary shares and a closing price of A$0.013 for the 2017 options, on May 27th, 2014, the Company has a current market capitalization of approximately A$56.63 million.

SAMSON OIL & GAS LIMITED

TERRY BARR
Managing Director

Statements made in this press release that are not historical facts may be forward-looking statements, including but not limited to statements using words like “may”, “believe”, “expect”, “anticipate”, “should” or “will.” Actual results may differ materially from those projected in any forward-looking statement. There are a number of important factors that could cause actual results to differ materially from those anticipated or estimated by any forward-looking information, including uncertainties inherent in estimating the methods, timing and results of exploration activities. A description of the risks and uncertainties that are generally attendant to Samson and its industry, as well as other factors that could affect Samson’s financial results, are included in the prospectus and prospectus supplement for its recent Rights Offering as well as the Company's report to the U.S. Securities and Exchange Commission on Form 10-K, which are available at www.sec.gov/edgar/searchedgar/webusers.htm.

Contacts

Samson Oil & Gas Limited
Terry Barr, CEO
303-296-3994 (US office)
970-389-5047 (US cell)

Contacts

Samson Oil & Gas Limited
Terry Barr, CEO
303-296-3994 (US office)
970-389-5047 (US cell)